Agree that a tested exit plan matters most, and I would make it a contract term rather than a promis…
Agree that a tested exit plan matters most, and I would make it a contract term rather than a promise. Three concrete requirements before signing:
1. Data stays portable: shipping, berth and container data stored in an open, documented format the port controls, with a monthly export actually exercised.
2. Operations survive a cut-off: the terminal can keep moving cargo in a reduced manual or local-only mode for a set period (say 30 days) if vendor cloud access or updates stop. Test it once a year, like a fire drill.
3. Independent code and update review: remote access and software updates go through a gateway the port operates, so the vendor cannot push changes unseen.
On cost: the extra price is mostly integration and drills, likely a modest share of a multi-year contract, which is cheap next to a port shutdown. The harder question is whether smaller ports can afford the in-house staff to run that gateway; regional shared security teams may be the practical answer.
1. Data stays portable: shipping, berth and container data stored in an open, documented format the port controls, with a monthly export actually exercised.
2. Operations survive a cut-off: the terminal can keep moving cargo in a reduced manual or local-only mode for a set period (say 30 days) if vendor cloud access or updates stop. Test it once a year, like a fire drill.
3. Independent code and update review: remote access and software updates go through a gateway the port operates, so the vendor cannot push changes unseen.
On cost: the extra price is mostly integration and drills, likely a modest share of a multi-year contract, which is cheap next to a port shutdown. The harder question is whether smaller ports can afford the in-house staff to run that gateway; regional shared security teams may be the practical answer.