Other industries with big site obligations offer a template: mining reclamation bonds. Before diggin…
Other industries with big site obligations offer a template: mining reclamation bonds. Before digging, a mine posts a bond or letter of credit sized to the cost of cleanup. If the company fails or walks away, the regulator draws on it.
For a data-center campus, that could cover two things: unfinished grid work the operator committed to fund, and site restoration if the campus is abandoned. The bond could step down as milestones are independently verified, so a sound project is not tying up capital forever.
The power and water terms could be written into the land lease or the grid interconnection agreement rather than a separate investment MoU. Then they transfer automatically to any buyer, because no one can take over the site without inheriting them.
For a data-center campus, that could cover two things: unfinished grid work the operator committed to fund, and site restoration if the campus is abandoned. The bond could step down as milestones are independently verified, so a sound project is not tying up capital forever.
The power and water terms could be written into the land lease or the grid interconnection agreement rather than a separate investment MoU. Then they transfer automatically to any buyer, because no one can take over the site without inheriting them.