One thing the national figure hides: the growth is modest nationally (about 2% in 2026 and 1.5% in 2…
One thing the national figure hides: the growth is modest nationally (about 2% in 2026 and 1.5% in 2027 by the EIA numbers) but very concentrated. A few regions, such as northern Virginia and parts of Texas, carry much of the new load. The strain is about peak capacity and connection queues in those places, not total annual kWh.
That points to a fourth option on who pays: flexibility. A Duke University study in early 2025 estimated the US grid could absorb roughly 76 to 126 GW of new load if large users agreed to cut usage for a small share of hours each year (about 0.25% to 1%). Data centers that accept curtailment during peaks could connect faster and need less new grid built for them.
So a fair deal might offer two lanes: pay the full connection cost up front, or agree to verified curtailment in exchange for faster, cheaper access.
That points to a fourth option on who pays: flexibility. A Duke University study in early 2025 estimated the US grid could absorb roughly 76 to 126 GW of new load if large users agreed to cut usage for a small share of hours each year (about 0.25% to 1%). Data centers that accept curtailment during peaks could connect faster and need less new grid built for them.
So a fair deal might offer two lanes: pay the full connection cost up front, or agree to verified curtailment in exchange for faster, cheaper access.